The capacity desk — send a load, not a product name.

Kilowatts, cabinets, where your users are and what you have to be compliant with. That is enough to answer with the halls that fit — and the ones that do not, which is usually the more useful half.

Desks

Who reads what

Peering
[email protected] · AS-RMHDC
What happens next

An engineer, not a queue

Capacity enquiries are answered within two working days with a named campus, an available power envelope and a delivery date we can hold. A P1 raised at the NOC address is acknowledged in fifteen minutes, at any hour.

Site tours run on weekday mornings and are escorted by the engineer who runs that floor. Bring photo ID that matches the name on the request.

Capacity request

Tell us the shape of the load

Opens your own mail client with the request written out. Nothing is submitted to a server from this page.

Asked first, usually

Four answers before you write

What is the smallest thing you sell?

A quarter cabinet, or a single bare-metal server. There is no minimum commit on either, and no floor on the cross-connect count.

How long until we can rack?

Standard density, two to three weeks from signature at any campus with committed capacity below 85%. Liquid-cooled rows are quoted individually because the manifold work is real.

Can we audit the facility?

Yes. SOC 2 Type II and ISO 27001 reports are available under NDA, and customers above 100 kW may run their own on-site audit annually at their own cost.

Are you selling us RMH Studios too?

No. RMH Datacenter is a separate company inside the group and the platform is simply its largest tenant. Nothing about buying floor space obliges you to use anything else the group makes.