Skip to content

Facilities

Six campuses we own — halls, power, cooling and committed capacity.

Not leased suites inside somebody else’s building. We hold the freehold, the generators and the fibre entering the site, which is why a maintenance window here is one we schedule rather than one we are notified about.

Campuses6Across three continents
Halls16Independently powered and cooled
Contracted148 MWUtility capacity across the estate
Land banked210 MWPermitted and awaiting build
ASH-01 · us-east

Ashburn, Virginia

The anchor campus, and the one the rest of the estate is measured against. Four halls on a 62 MW utility feed, two substations on separate transmission paths, and the densest peering fabric we touch anywhere — fourteen carriers enter the building through two diverse conduits.

Committed capacity87%
Halls
4
Contracted power
62 MW
Design standard
Tier IV
PUE (TTM)
1.09
Cooling
Rear-door heat exchangers, N+2 chillers
Attestations
SOC 2 Type II · ISO 27001 · PCI DSS · HIPAA
Access
Five layers, mantrap, biometric at the cage, escorted remote hands 24/7
DUB-02 · eu-west

Dublin, Ireland

The European landing point and the most efficient hall we run: Irish ambient means indirect free cooling for all but a few hundred hours a year, and the supply is 100% renewable on a fifteen-year wind PPA. Data stays in the EU by contract as well as by geography.

Committed capacity71%
Halls
3
Contracted power
28 MW
Design standard
Tier III+
PUE (TTM)
1.06
Cooling
Indirect free cooling, 8,400 h/year
Attestations
SOC 2 Type II · ISO 27001 · ISO 50001 · GDPR
Access
Five layers, mantrap, biometric at the cage, escorted remote hands 24/7
SIN-01 · ap-southeast

Singapore

The APAC hall, liquid cooled end to end because at 30 °C ambient with 80% humidity air is the expensive coolant. It carries the worst PUE in the estate and the best watts-per-rack, which is the trade tropical density actually makes.

Committed capacity84%
Halls
2
Contracted power
18 MW
Design standard
Tier III+
PUE (TTM)
1.28
Cooling
Direct-to-chip liquid, 40 kW racks
Attestations
SOC 2 Type II · ISO 27001 · MTCS Level 3
Access
Five layers, mantrap, biometric at the cage, escorted remote hands 24/7
FRA-03 · eu-central

Frankfurt, Germany

Continental Europe’s interconnection point, and the campus that exports its waste heat: recovered water leaves the building at 42 °C into a district heating loop that serves about 1,300 homes over a winter.

Committed capacity58%
Halls
3
Contracted power
22 MW
Design standard
Tier III+
PUE (TTM)
1.11
Cooling
Adiabatic, with district heat export
Attestations
SOC 2 Type II · ISO 27001 · C5 · GDPR
Access
Five layers, mantrap, biometric at the cage, escorted remote hands 24/7
PDX-01 · us-west

Hillsboro, Oregon

The west-coast site, on hydro supply and the transpacific cable landings. Smaller than the others on purpose: it exists so a US customer can hold a second copy of their estate on a different grid interconnection without leaving the country.

Committed capacity46%
Halls
2
Contracted power
10 MW
Design standard
Tier III
PUE (TTM)
1.10
Cooling
Evaporative, WUE 0.21 L/kWh
Attestations
SOC 2 Type II · ISO 27001
Access
Five layers, mantrap, biometric at the cage, escorted remote hands 24/7
GRU-01 · sa-east

São Paulo, Brazil

The newest campus, opened to serve South American latency rather than to chase capacity. Two halls, room on the land for four more, and the only site in the estate where we still buy grid power on a spot contract.

Committed capacity38%
Halls
2
Contracted power
8 MW
Design standard
Tier III
PUE (TTM)
1.19
Cooling
Chilled water, N+1
Attestations
SOC 2 Type II · ISO 27001 · LGPD
Access
Five layers, mantrap, biometric at the cage, escorted remote hands 24/7
Getting in

Five layers between the road and your cage

L1 · L2

Perimeter and lobby

Anti-ram fencing, vehicle traps and a staffed lobby where every visit is against a named ticket raised at least 24 hours ahead.

L3

Mantrap

A single-occupancy interlock with weight and badge agreement — the door behind you closes before the one in front opens, and tailgating is a physical impossibility rather than a policy.

L4 · L5

Hall and cage

Biometric at the hall door and again at your cage, with a 90-day retained camera record covering every aisle and a per-cabinet electronic lock log you can export.

Site tour

Walk the hall before you sign for it

Tours run on weekday mornings at every campus, escorted by the engineer who runs that floor rather than by a salesperson.

We use essential cookies to run the site and privacy-friendly analytics to improve it. Learn more