Power & cooling
Where the watts go, published per campus with the worst one included.
Two utility feeds, two UPS trains, two generator plants and a cooling loop designed to survive losing half of itself. Everything below is a trailing twelve-month figure, which means it includes the heat waves.
From the substation to the PDU
Every hall is fed by two independent paths from the utility to the cabinet, and each path is sized to carry the whole load on its own. Concurrent maintainability is the design goal: any component can be taken out for work with the hall still running on the other side.
- Utility
- Two feeds from separate substations on separate transmission paths at the four largest campuses; a single feed with a second ring connection at the two smallest.
- UPS
- Two independent 2N lithium-ion trains per hall, each holding the full load for eight minutes — long enough for the generators, and short enough that nobody is tempted to treat the battery as a plan.
- Generation
- N+1 diesel plant with 72 hours of fuel on site and two contracted resupply routes. Started under load monthly and run to full rated output twice a year.
- Distribution
- A+B busway to every cabinet, metered per outlet, with the readings exposed in the portal and over the API at one-minute resolution.
PUE per campus, worst included
Singapore is the outlier and stays on the list. A tropical hall running 40 kW cabinets on liquid will never post a Dublin number, and hiding it behind a fleet average would misrepresent both.
The bar is total facility power divided by IT load, measured at the utility intake and averaged over the trailing twelve months, plotted against a 1.40 floor. A fuller bar is a better ratio, and a campus above 1.20 is drawn in the warning tone rather than the accent.
Three loops, chosen by climate
There is no single right cooling design; there is a right one for the ambient outside the wall. Each campus was built for its own climate rather than to a group standard.
Indirect free cooling
Dublin and Hillsboro. Outside air cools a sealed internal loop through a heat exchanger, so the hall never breathes what is outside it. 8,400 usable hours a year in Dublin.
Rear-door heat exchangers
Ashburn and Frankfurt. Water at the back of the cabinet catches the heat where it is made, which keeps the hall itself at a working temperature for the people in it.
Direct-to-chip liquid
Singapore throughout, and the accelerator halls everywhere else. Cold plates on the die, a CDU per row, and a dry-cooler loop that never touches the building chillers.
The heat has somewhere to go
A datacenter converts almost all of its electricity into low-grade heat. Rejecting that to the sky is the default; selling it into a district loop is better, and at Frankfurt it is what happens.
- Frankfurt · 42 °C out
- Recovered water leaves FRA-03 into the municipal heating loop at 42 °C, roughly 14 GWh over the last twelve months — about 1,300 homes through a German winter.
- Water, counted
- Fleet WUE is 0.31 L/kWh and Hillsboro is 0.21. Evaporative cooling trades water for electricity, so publishing PUE without WUE tells only the flattering half of that trade.
Your share of all of this, monthly
Customers get their own energy, water and carbon attribution against measured load rather than a floor-space ratio — the numbers a sustainability report can actually be built from.