Platform
The same halls, sold at whichever layer you want to stop caring at.
The same halls, the same power train and the same network, sold at five different depths — from an empty cage you rack yourself to a pod of accelerators we run for you. Moving between them is a contract change, not a migration.
Colocation — your hardware, our floor
Half racks, full racks and locked cages from a quarter cabinet to a private suite. Sold by drawn kilowatts rather than by rack unit, so a half-empty cabinet full of GPUs is priced honestly and a full cabinet of storage is not penalised for existing.
- Power
- A+B feeds from separate UPS trains and separate generators, metered per PDU and readable through the API. Standard cabinets are provisioned to 12 kW; high-density rows go to 40 kW on liquid.
- Remote hands
- Staffed 24/7 at every campus, with a 15-minute response commitment on a P1. Reboots, media swaps and cabling are included; anything longer than an hour is quoted before it starts.
- Cross-connects
- A one-time install fee and no monthly rent. Connecting to another tenant in the same building should not be an annuity, and treating it as one is why so much traffic takes a detour through an exchange.
- Change windows
- Published a quarter ahead, because we schedule our own platform migrations against the same calendar. Emergency work is announced within 30 minutes of the decision, not after it.
Bare metal — a whole machine, provisioned in minutes
Single-tenant servers with no hypervisor between your workload and the silicon: no noisy neighbour, no steal time, and a NUMA topology that is the one on the datasheet.
General purpose
32–192 cores, 256 GB–3 TB, dual 25G. The default for application and database tiers.
Ready in ~7 minStorage dense
Up to 1.2 PB raw per chassis on spinning disk, or 240 TB of NVMe for hot sets.
Hardware or ZFSMemory optimised
Up to 12 TB of RAM for in-memory databases and analytics that refuse to shard.
Pinned NUMAAccelerated compute — halls built for 40 kW racks
A training run does not fail because the GPUs are slow; it fails because the rack cannot dissipate them. These halls are direct-to-chip liquid cooled from the slab up, with a coolant distribution unit per row and a dry cooler loop that never touches the building chillers.
- By the node
- Eight accelerators, NVLink inside the chassis, 400G to the fabric. Hourly, or reserved for a year at roughly a third of that.
- By the pod
- Thirty-two nodes on a non-blocking rail-optimised fabric, delivered as one scheduler domain with a shared parallel filesystem.
- Bring your own
- If you already own the accelerators, we will cool them. Liquid-ready cabinets are available in Ashburn, Singapore and Frankfurt with manifolds pre-plumbed.
- What we tell you first
- Lead time, honestly. Accelerator supply moves, and a delivery date we cannot hold is worth less to you than a slot two months out that we can.
Storage — in the same building as the compute
Block, object and archive tiers on the same floor as your servers, reachable over a cross-connect rather than the internet — which is the difference between a restore that is a scheduling problem and one that is a budget problem.
- Block
- Triple-replicated NVMe, single-digit millisecond p99, snapshots that do not stall the writer. Attaches to bare metal and to colocated hosts alike.
- Object
- S3-compatible, erasure coded across three halls in a region, versioned and object-locked where a retention rule says so. No egress charge within our own network.
- Archive
- LTO in a robot library, two copies in two campuses, retrieval measured in hours and quoted before you commit. Written, verified and periodically re-read rather than assumed.
Resilience — a second site, and a rehearsal you cannot skip
A warm standby on a different grid interconnection and a different fibre path, replicated over the backbone at no egress cost. The contract requires two rehearsed failovers a year, because an untested plan is a document rather than a recovery.
Down to 30 seconds
Continuous block replication between campuses in the same region, or asynchronous across regions.
Under 15 minutes
Measured at the last rehearsal, not at the design review — and the report is yours.
Twice a year
Scheduled with you, run against production data, and written up whether or not it went well.
Send a load, get a hall
Kilowatts, cabinets, regions and compliance obligations. A quote comes back within two working days, with the campuses that do not fit named as well as the ones that do.